Residential Project

Garnett’s Wharfe, Otley

Advance Two were contacted in late 2023 to assist Barratt’s technical team with the adoption of the sewers on a legacy site in Otley. All Section 104 works were successfully completed in 2024.

Project info

Client

Barratt Homes

Project Year

December 2023

Location

Otley – West Yorkshire

About project

The Challenge

The project involved steel storage pipes exhibiting defects. Initial feedback from Yorkshire Water suggested a full system rebuild using traditional pipework, presenting a significant challenge that required careful assessment and consideration of alternative, cost-effective solutions.

The Solution

Advance Two engaged a metallurgist to assess the network, producing a report confirming the structural integrity of the storage pipes. Following this, Yorkshire Water reduced the remedial scope to applying a new in‑situ coating, avoiding a costly full system replacement. The works caused minimal disruption to residents, and the S104 was successfully placed onto maintenance.